There were lots of strong arguments for Design for Manufacture and Assembly (DfMA), but the water industry has massive momentum comprising regulation, commercial and contractual models, traditional methods, and multiple stakeholders that has always made it difficult to change direction. It has taken a decade to overcome the arguments (DfMA increases CAPEX, decreases choice, disadvantages suppliers, takes control away from the end user, etc.), but, in the end, we got there.