The challenge
The original wastewater treatment plant (WWTP) was constructed around 1940 and had been upgraded over the years to take into account population increases in the area. The old plant consisted of two primary settlement tanks, two biofilters, two humus tanks, a secondary clarifier, a chlorine contact tank, three lagoons and a final pond, with the purified effluent expelled into the Stuart River. The old plant was outmoded in both capacity and operational efficiency. The upgraded design needed to serve a population equivalent of 11,000.